R&S Glass Seamless Eavestrough System

Seamless Eavestroughs Made to Exact Length
Cash and carry
Delivered
Supply and install
Stock Colours - All other colours available within 24 hours
Eavestrough delivery - Local , Out of town

Seamless Eavestroughs Pricing
Trough 10’ (2500 cm)
Trough by the foot
Gutter bracket with screw
End cap set
Outlet
Down Pipe 9’ 10"
A or B elbow
Down pipe strap
Inside/outside mitre
Gutter seal
POP rivets pac of 100
3/8 or 5/8 screws
Gutter guard
Corner splash guard
Down pipe strainer
Flip up hinge
Large square downpipe
Large square elbow

8 Steps to Intallation
1. Measure all trough lengths. Deduct 4 " (10 cm) for inside corners. Assemble each trough on the     ground to its full length. To join 2 lengths together cut top part of one length slide into the other, POP     rivet or screw and caulk.
2. Snap in hangers every 2 feet (60 cm) and at every joint. Cut hole for outlet by using outlet as     template. Caulk under flange and press into hole. POP rivet or screw and caulk. Install end caps,     crimp with pliers and seal with caulk along the inside.
3. Install trough starting with the end opposite the outlet and hang as high as possible on the fascia.     Attach every 3rd or 4th hanger. Allow a 1" (2.5 cm)drop for every 40 ft.(12 m) When trough is secure     fasten remaining hangers and tighten all screws.
4. If corners are required, slide corners into place in the same manner as joining tow length of trough     together. Allow 2" (5 cm)overlap, and secure with POP rivets or screws and caulk.
5. Select elbows for downspouts. Type A elbows are used when going flat against the face wall of the     house on the same side as trough. Type B elbows are used when going down side wall of house.
6. Assemble downspouts as shown. Top pieces should fit into lower pieces to prevent leaks. Secure     with POP rivets or screws.
7. Attach elbow to downspout as shown. Add a short length of downspout to take water away from     house.
8. Secure top of elbow to outlet. Install caps with screws.

Note:
Existing roof should extend a minimum of 1" (2.5 mm) into eavestrough for proper drainage. If it does not, install flashing under the first row of shingles.